Central Asian Geoportal of Tajikistan

Investment in Tajikistan

 

INVESTMENT’S PROPOSAL №1

Name of the Project

“Renewal of attained capacities for production of main kinds of products”

The purpose of the Project

Restoration of attained capacities: I stage – 60 electrolysis, II stage – 120 electrolysis, III stage – 180 electrolysis, IV stage – 240 electrolysis, improvement of quality of the current product and providing of new products in the market, introduction of new capacities.

The brief description of the Project

- restoration of attained production capacities;
- improving the quality of products;
- presenting new kinds of products in the market

Overall costs of the Project

18.4 million US dollars

The Break-even point of  Project

The Project needs the feasibility study

The Proposal of Investment’s activity

Direct Investment

INVESTMENT’S PROPOSAL №2

Name of the Project

«Creation of capacities on antimony
manufacture and it compound»

The purpose of the Project

Creation of capacities on manufacture of 2000 tons metallic antimonies and 3000 tons its cleared trioxides in one year

The brief description of the Project

Project provides creation of capacities on manufacture of antimony and its connections by capacity of 5000 tons in one year on the basis of domestic raw material (concentrate of Anzob Mining Factory).
Enterprise having more then 50-years operational experience in the field of manufacture of rare-metal production, being guided on the base of antimonies raw-material reserve existing in Tajikistan presented by largest deposits Jijikrut, Scalnoe, Konchoch, Shing and others (more than 80 % of the dissolved stocks of Central Asian region), is going to let release production - metallic antimony and its connections in odder satisfaction world requirement which is estimated at a level more than 80 thousand tons.

Overall costs of the ProjectFrom them:
Own means 
The external investments

11 million US dollars

1.45 million US dollars
8.55 million US dollars

The Break-even point of  Project

6 years.

The Proposal of Investment’s activity

Direct Investment

INVESTMENT’S PROPOSAL №3

Name of the Project

Ziddi Coal Field

The purpose of the Project

A. Expansfon the existing capacity of the field production with open method up to 60
thousand tons a year through Implementing more productive equipment with electric drive at the
quarry.
B. Implementing new extraction technologies of deep mining at the field lor ptoduction of
20 - 40 thousand tons a year

The brief description of the Project

Ziddi Coal Field is located 72 km north from Dushanbe and 10 km Irom Dushanbe -Khujand highway.
Coals belong to L1G j" brand:
Ashes of Coat-22-27%-
Moisture content - 3-5%
Volatility - 30-37%
Sulfur - 1.1%
Hating value varies from 6700 to 8000 kkal/hg
Content of Carbon - 76-80%
Hydrogen - 4-5%
Ziddi coal field was studied in detail with geological survey works. Coal supply (reserves) constitutes more than 20 million tons of A+B+Cx category and more than 25 million tons of C2 category.
Predictable resources are estimated in volume of 44 million tons. Besides, fire-clay reserves are estimated in volume of 20million tons

Overall costs of the Project

USD 25 million

The Break-even point of  Project

The Project needs the feasibility study

The Proposal of Investment’s activity

BOT. Direct investment

INVESTMENT’S PROPOSAL №4

Name of the Project

On production of sheet windows pane and glass utensils

The purpose of the Project

Plant construction on production of sheet windows pane and glass utensils  with annual productivity 40000 t. glass weight in year

The brief description of the Project

Providing Republic of Tajikistan by the sheet windows pane and glass utensils allows to reduce the present deficit of the given production for processing industry of agriculture, canneries, building and other branches of national economy of the Republic of Tajikistan, and also allows to improve export potential and to save expenditures for getting glass products abroad the republic.

Overall costs of the Project From them:
Own means 
The external investments

29.5 million US dollars

4.0 million US dollars
25.5 million US dollars

The Break-even point of  Project

5 years

The Proposal of Investment’s activity

Direct Investment

INVESTMENT’S PROPOSAL №5

Name of the Project

Shurab brown-coal field is being developed by OJSC 'Angisht"

The purpose of the Project

A. Rehabilitation of field ventilating drift and ventilating sloping shaft. Commissioning of skip shaft and drainage of horizon
B. Increase of coal production by deep-mining method through modernization of equipment and updating development technology for production of 400 thousand
tons a year
C. Construction of a shop for production of liquid and coal fuel

The brief description of the Project

The coal field is multilayer; coals are brown and have average ashes. The field is located in Isiara region of Sogd district It was developed by deep mining method since 1939 in two mines: mine NoS (ShuratH site) and mine Nol/2.
The field coals belong to "B" type (brown) with average ashes from 10,8 to 16,0%. Heating value of the coals - 7035-7190 kkal/kg.
In 1960-1970 coal extraction in the field reached 1 million tons, in 1990 - 433.2 thousand tons, and in 2002 - 6 thousand tons.
The absolute location altitude of the field is +1250 m.
Coal reserves от Shurab field were calculated in 1937, 1940, 1952, 1962. 197S and 1992. The last calculation of reserves and its results are brought in reports of 1993 year, and in 1999 report it is +5D0m. Mine No8 executes extracting works in old mining areas afso, where the bed approaches to surface and ts damaged by numerous extracting of 1942-1950 years. Total coal supply: 144.6 million ton

Overall costs of the Project
The external Investment

USD 7.7 million 
USD 6.0 million

The Break-even point of  Project

Tenure of cut's employment 32 years

The Proposal of Investment’s activity

BOT. Direct investment

INVESTMENT’S PROPOSAL №6

Name of the Project

Production of sheet windows pane and glass utensils in “Proletarskiy Mining Concentrating Combine (MCC)”

The purpose of the Project

Plant construction on production of sheet windows pane and glass utensils  with annual productivity 40000 t. glass weight in year with

The brief description of the Project

Actual capacity of release of the production product for 2004 year amounted  2132,1 thousand Somoni or  116,4% to the proper period 2003 year, the main kind of releasing product is enriched sand and quartz sand.
In 2004 year have been processed 35625 t. Enriched sand and 48374 t. quartz sand, 185 people average number, the level of the average wages have gained 71, 67 Somoni, in comparison to previous years the average height of the  amounted 111%.  In present time are engaged in production 202 people working on  result of activity of first quarter of 2005 year growth of wage on plan amounts 88,6%  by correspondent period of the previous year amounts  112,1%, growth of the average number to plan amounts 130,7%, by correspondent period of the previous period amounts 133,3% volume of release of the industrial production are implemented on  245,1 thousand Somoni or on  101,6% to plan task, and in  2004  growth makes 360,8%.
Planed construction of the Glass Plant will be placed in the ready building of Shop on production of ceramic bar, the square of which amounts 2592 m2  equipped with the existing equipments – gas pipeline with the capacity of average pressure Р-0,4 kg.s/sm2, the top limit of the gas charge dimension is 3200 kg.s/sm2  with the electrical line with the capacity   2520 quar. and water pipeline net with daily productivity of a chink  1512 m3 with available protection and branch of rail and highway.  In the Plant will be used the local raw material recourses which deposits amount 42 mln.t. quartz sand which amount 65% of the raw material component for the production of glass products also technical soda and salt placing in Asht and Isfara Districts of Sogd Region of the republic of Tajikistan

Overall costs of the Project

USD  2.8 million

The Break-even point of  Project

5 years

The Proposal of Investment’s activity

Direct Investment

INVESTMENT’S PROPOSAL №7

Name of the Project

Mining and processing of the granite and installation of up-to-date equipment

The purpose of the Project

Mining and processing of the granite in the deposit Shaidan using efficient equipmentin order

The brief description of the Project

The project includes acquisition of modern technological equipment required for mining of granite made polished tiles

Overall costs of the Project From them:
Own means 
The external investments

1.22 million euro

0.1 million euro
1.12 million US dollars

The Break-even point of  Project

The Project needs the feasibility study

The Proposal of Investment’s activity

Direct Investment

INVESTMENT’S PROPOSAL №8

Name of the Project

Nazar-Aylok antyracite coal-field in Rasht region

The purpose of the Project

Develope of Nazar-Aylok antyracite coal-field in Rasht region

The brief description of the Project

Nazar-Aylok anthracite coal field is located in south slope of Zerafshan mountain-range. Total area of the field Is 36 square kilometers.
By administrative division Nazar-Aylok anthracite coal field belongs to Rasht region of Tajikistan. Hait village is the nearest settlement. The distance from Halt village to acting "Shikor-Khona" quarry is 33 km of earth road, and the last 15 km is tractor pass, which does not meet requirements of construction norms. An asphalt highway goes through Hait village. The distance from the village to Dushanbe is 269 km. The nearest railway station is In Vahdat region (249 km).
The field relief is typically high-mountain. Absolute altitude varies from 2100 to 4100 m. The highest point of bed abruption is 4050 m. Paleozoic, Reptiles and Cainozoe age deposits take part in Nazar-Aytok anthracite coal field structure.
Paleozoic deposits are extended in south and east parts of the field and are coaly, quartz-peach-sulfurt quartz-peach slates with limestone lenses and quartz layers of 2 m capacity.
Anthracites of IV and VI beds are the most clean, which ashes comprise 5.03 - 5.69%. Average quality indicators of IV, VT V-a and VI beds are as follows:
Humidity - 2,7% (maximal up to 9,9 - 11,07%)
Ashes - 8.59%
Sulfur - 0.39%
Volatile matters -14.07%
Hydrogen - 3.29%
Carbon - 87.2%
Heating value - 28500-32400 kJ/kg
Total coal supply: - 212.5 million ton
Predictable supply: - 400 million ton
Coal supply in the coal-field including: - 3300 million ton

Overall costs of the Project

USD 136 283 000

The Break-even point of  Project

Tenure of cut's employment 32 years

The Proposal of Investment’s activity

BOT. Direct investment

INVESTMENT’S PROPOSAL №9

Name of the Project

Fon-Yagnob Coking Coal Field

The purpose of the Project

A. Expansion the existing capacity of the field production with open method of
higher levels up to 315 thousand tons a year. 
B. Increase of coal production by deep-mining method through implementing more
productive equipment for production of 45-50 thousand tons a year. C. Construction of a coal factory  

The brief description of the Project

Coals are characterized with the content of hydroscoprc humidity of 0,25-2.62%.
The most widespread content of ashes is 10-18%.
Humidity - 0,35-1.88%;
Ashes - 3,99-24.54%;
Vol ati le matte rs - 23.11-36.90%;
Total sulfur - 0.1-1.96%;
Combustion heat - 7936-8473 kkal/kg {33.43-35.43 MJ/kg);
Carbon - 80.43-86.82%;
Hydrogen - 4.73-6.10%;
Beds metric in d icators x= 221142 mm, y=01111 mm;
Vitrlne amount - 42.6-71.6%.
State Committee on Reserves of USSR confirmed coal reserves of category up to 204.0 million tons, category Cs - 192.11 million tons; coking coal by categories B+Ci - 114.5 million tons and Сз - 153.31 million tons.
State Committee on Reserves of USSR, by the Decision N02029 from 15 May 1990 confirmed coaf reserves in "Karierniy" site of Eastern area of Fon-Yagnob field to 29908 thousand tons of category B+Cj, and 3622 thousand tons of category C? with further passing to Fon-Yagnob mine.
In 2003 coal reserves of excavation btac No4 and gallery NolO were taken into the mine balance as increase in 47 thousand tons {category Ci) due to exploring

Overall costs of the Project

USD 51.02 million

The Break-even point of  Project

The Project needs the feasibility study

The Proposal of Investment’s activity

BOT. Direct investment